Inicio · Argelia · Metro / Túnel

Algeria Metro / Túnel Cranes

Direct-from-factory cranes for Argelia Metro / Túnel projects — CIF to Algiers · Oran, sales support in Arabic/French.

Why Argelia Metro / Túnel Buyers Choose Chunhua

For Argelia buyers in the Metro / Túnel sector, the standard configuration is MGH scramble crane, 150T — engineered specifically for subway tunnel construction operations covering TBM assembly, segment handling.

Contexto del mercado local: Steel mill modernization. Our project engineering team is familiar with the regulatory and engineering norms of África projects. CIF shipping to Algiers · Oran with all major liner schedules supported.

Proyecto flujo de trabajo: send your facility specs (workshop dimensions, capacity needs, environment conditions, certification requirements) on WhatsApp — we reply with recommended model + CAD dibujo + precio dentro de 4 hours. Lead time 30-45 days production, sea freight 25-45 days to Algiers. Pago: 30% T/T deposit + 70% T/T or L/C at sight. Certificación: CE, CCC, SGS available per project.

MODELOS RECOMENDADOS

Subway / Tunnel Grullas Modelos for Algeria

Crane Quote for Argelia Metro / Túnel Project

Send your specs (capacity / span / lifting height / port of Algiers) — we reply with model + CAD drawing + CIF price within 4 hours, in Arabic/French.

Chatea con nosotros
Responder en minutos · o WhatsApp +86 158 5515 8769
¿Prefieres WhatsApp? Toca aquí →