Inicio · Iran · Metro / Túnel

Iran Metro / Túnel Cranes

Direct-from-factory cranes for Iran Metro / Túnel projects — CIF to Bandar Abbas, sales support in Persian/English.

Why Iran Metro / Túnel Buyers Choose Chunhua

For Iran buyers in the Metro / Túnel sector, the standard configuration is MGH scramble crane, 150T — engineered specifically for subway tunnel construction operations covering TBM assembly, segment handling.

Contexto del mercado local: Steel and petrochem expansion. Our project engineering team is familiar with the regulatory and engineering norms of Oriente Medio projects. CIF shipping to Bandar Abbas with all major liner schedules supported.

Proyecto flujo de trabajo: send your facility specs (workshop dimensions, capacity needs, environment conditions, certification requirements) on WhatsApp — we reply with recommended model + CAD dibujo + precio dentro de 4 hours. Lead time 30-45 days production, sea freight 25-45 days to Bandar Abbas. Pago: 30% T/T deposit + 70% T/T or L/C at sight. Certificación: CE, CCC, SGS available per project.

MODELOS RECOMENDADOS

Subway / Tunnel Grullas Modelos for Iran

Crane Quote for Iran Metro / Túnel Project

Send your specs (capacity / span / lifting height / port of Bandar Abbas) — we reply with model + CAD drawing + CIF price within 4 hours, in Persian/English.

Chatea con nosotros
Responder en minutos · o WhatsApp +86 158 5515 8769
¿Prefieres WhatsApp? Toca aquí →