Início · Filipinas · Metrô / Túnel

Philippines Metrô / Túnel Cranes

Direct-from-factory cranes for Filipinas Metrô / Túnel projects — CIF to Manila · Cebu, sales support in English/Tagalog.

Why Filipinas Metrô / Túnel Buyers Choose Chunhua

For Filipinas buyers in the Metrô / Túnel sector, the standard configuration is MGH scramble crane, 150T — engineered specifically for subway tunnel construction operations covering TBM assembly, segment handling.

Contexto do mercado local: Infrastructure modernization. Our project engineering team is familiar with the regulatory and engineering norms of Southeast Asia projects. CIF shipping to Manila · Cebu with all major liner schedules supported.

Projeto workflow: send your facility specs (workshop dimensions, capacity needs, environment conditions, certification requirements) on WhatsApp — we reply with recommended model + CAD desenho + preço dentro 4 hours. Lead time 30-45 days production, sea freight 25-45 days to Manila. Pagamento: 30% T/T deposit + 70% T/T or L/C at sight. Certificação: CE, CCC, SGS available per project.

MODELOS RECOMENDADOS

Subway / Tunnel Gruas Modelo for Philippines

Crane Quote for Filipinas Metrô / Túnel Project

Send your specs (capacity / span / lifting height / port of Manila) — we reply with model + CAD drawing + CIF price within 4 hours, in English/Tagalog.

Converse conosco
Responder em minutos · ou WhatsApp +86 158 5515 8769
Prefere WhatsApp? Toque aqui →