Início · Chile · Construção Naval

Chile Construção Naval Cranes

Direct-from-factory cranes for Chile Construção Naval projects — CIF to Valparaiso, sales support in Spanish.

Why Chile Construção Naval Buyers Choose Chunhua

For Chile buyers in the Construção Naval sector, the standard configuration is MGH/MG large gantry, 150-300T capacity — engineered specifically for shipyard operations covering ship hull segments, marine engine assembly, offshore platforms.

Contexto do mercado local: Copper mining heavyweight. Our project engineering team is familiar with the regulatory and engineering norms of América Latina projects. CIF shipping to Valparaiso with all major liner schedules supported.

Projeto workflow: send your facility specs (workshop dimensions, capacity needs, environment conditions, certification requirements) on WhatsApp — we reply with recommended model + CAD desenho + preço dentro 4 hours. Lead time 30-45 days production, sea freight 25-45 days to Valparaiso. Pagamento: 30% T/T deposit + 70% T/T or L/C at sight. Certificação: CE, CCC, SGS available per project.

MODELOS RECOMENDADOS

Shipbuilding Gruas Modelo for Chile

Crane Quote for Chile Construção Naval Project

Send your specs (capacity / span / lifting height / port of Valparaiso) — we reply with model + CAD drawing + CIF price within 4 hours, in Spanish.

Converse conosco
Responder em minutos · ou WhatsApp +86 158 5515 8769
Prefere WhatsApp? Toque aqui →