Home · Iran · Petrochemical

Iran Petrochemical Cranes

Direct-from-factory cranes for Iran Petrochemical projects — CIF to Bandar Abbas, sales support in Persian/English.

Why Iran Petrochemical Buyers Choose Chunhua

For Iran buyers in the Petrochemical sector, the standard configuration is LB-series explosion-proof, 10-50T — engineered specifically for chemical plant operations covering reactor maintenance, vessel handling, explosion-proof.

Local market context: Steel and petrochem expansion. Our project engineering team is familiar with the regulatory and engineering norms of Middle East projects. CIF shipping to Bandar Abbas with all major liner schedules supported.

Project workflow: send your facility specs (workshop dimensions, capacity needs, environment conditions, certification requirements) on WhatsApp — we reply with recommended model + CAD drawing + price within 4 hours. Lead time 30-45 days production, sea freight 25-45 days to Bandar Abbas. Payment: 30% T/T deposit + 70% T/T or L/C at sight. Certification: CE, CCC, SGS available per project.

RECOMMENDED MODELS

Petrochemical Crane Models for Iran

Crane Quote for Iran Petrochemical Project

Send your specs (capacity / span / lifting height / port of Bandar Abbas) — we reply with model + CAD drawing + CIF price within 4 hours, in Persian/English.

Chat with us
Reply within minutes · or WhatsApp +86 158 5515 8769
Prefer WhatsApp? Tap here →