Beranda · Selandia Baru · Pertambangan

New Zealand Pertambangan Cranes

Direct-from-factory cranes for Selandia Baru Pertambangan projects — CIF to Auckland, sales support in English.

Why Selandia Baru Pertambangan Buyers Choose Chunhua

For Selandia Baru buyers in the Pertambangan sector, the standard configuration is LB tahan ledakan, 5-50T — engineered specifically for mining equipment manufacturing operations covering ore handling, heavy machinery, explosion-proof.

Konteks pasar lokal: Port and dairy industry. Our project engineering team is familiar with the regulatory and engineering norms of Oceania projects. CIF shipping to Auckland with all major liner schedules supported.

Proyek alur kerja: send your facility specs (workshop dimensions, capacity needs, environment conditions, certification requirements) on WhatsApp — we reply with recommended model + Gambar CAD + harga dalam 4 hours. Lead time 30-45 days production, sea freight 25-45 days to Auckland. Pembayaran: 30% T/T deposit + 70% T/T or L/C at sight. Sertifikasi: CE, CCC, SGS available per project.

MODEL DIREKOMENDASIKAN

Mining Model Derek for New Zealand

Crane Quote for Selandia Baru Pertambangan Project

Send your specs (capacity / span / lifting height / port of Auckland) — we reply with model + CAD drawing + CIF price within 4 hours, in English.

Chat dengan kami
Balas dalam hitungan menit · atau WhatsApp +86 158 5515 8769
Lebih suka WhatsApp? Tekan di sini →