Beranda · Iran · Metalurgi

Iran Metalurgi Cranes

Direct-from-factory cranes for Iran Metalurgi projects — CIF to Bandar Abbas, sales support in Persian/English.

Why Iran Metalurgi Buyers Choose Chunhua

For Iran buyers in the Metalurgi sector, the standard configuration is YZ heavy metallurgy, 50-150T — engineered specifically for metallurgical processing plant operations covering high-temperature material handling.

Konteks pasar lokal: Steel and petrochem expansion. Our project engineering team is familiar with the regulatory and engineering norms of Timur Tengah projects. CIF shipping to Bandar Abbas with all major liner schedules supported.

Proyek alur kerja: send your facility specs (workshop dimensions, capacity needs, environment conditions, certification requirements) on WhatsApp — we reply with recommended model + Gambar CAD + harga dalam 4 hours. Lead time 30-45 days production, sea freight 25-45 days to Bandar Abbas. Pembayaran: 30% T/T deposit + 70% T/T or L/C at sight. Sertifikasi: CE, CCC, SGS available per project.

MODEL DIREKOMENDASIKAN

Metallurgy Model Derek for Iran

Crane Quote for Iran Metalurgi Project

Send your specs (capacity / span / lifting height / port of Bandar Abbas) — we reply with model + CAD drawing + CIF price within 4 hours, in Persian/English.

Chat dengan kami
Balas dalam hitungan menit · atau WhatsApp +86 158 5515 8769
Lebih suka WhatsApp? Tekan di sini →